How it works

Site coordinates in. Investment intelligence out.

Two levels of engagement. Start with a Stage 1 screening for £850, then go deeper if you need to.

1

Brief

Share site coordinates, technology type, capacity, and connection info. If you have a grid offer or preliminary studies, share those too. A 20-minute call is usually enough.

2

Simulate

Proprietary models run LIFO queue analysis, constraint simulations, price formation, and attrition scenarios against live GB grid data. We build the full temporal curtailment profile for your site.

3

Deliver

You receive a screening intelligence pack with curtailment quantification, revenue sensitivity, queue analysis, and a full assumption register. Plus a call to walk through the findings.

Stage 1 screening

The foundation. Fixed price. Fast turnaround.

The Stage 1 assessment is a fixed-scope screening designed to answer the most critical question: does the curtailment risk at this site make the project investable? Delivered within 2 working days for a fixed fee of £850 per site.

This is not a full grid study. It's a screening tool built for speed and affordability, giving you the intelligence to decide whether a site warrants deeper analysis.

£850 per site screening
  • LIFO queue analysis with attrition scenario modelling
  • Temporal curtailment heatmaps (hour-by-month)
  • Constraint-aware revenue impact analysis
  • Connection feasibility assessment
  • Sensitivity analysis with weighted factors
  • LTDS Upgrades overlayed
  • Full assumption register
  • Walkthrough call
Talk to Henry
Going deeper

Bespoke studies for complex situations.

Some projects need more than a screening. If you're negotiating connection terms, comparing multiple substations, stress-testing for project finance, or need analysis tailored to a specific regulatory question, we can scope a bespoke engagement.

Bespoke studies are priced on scope and complexity. Typical engagements range from £3,000 to £15,000 depending on the depth of analysis required.

Multi-substation comparison

Screen and compare multiple connection options side by side. Full LIFO analysis for each, with comparative revenue impact.

Project finance support

Detailed sensitivity analysis, DSCR stress testing, discounted cashflow modelling, and bankable assumption documentation for lender due diligence.

Regulatory analysis

Gate 2 impact assessment, ANM control rule modelling, and connection agreement term analysis.

Portfolio programmes

Structured screening programmes for 10+ sites with consistent methodology and portfolio-level reporting.

Our technology

Purpose-built simulation on GB grid data.

This isn't a generic analytics layer wrapped around public data. Our models are built from scratch to handle the specific physics and economics of the GB electricity network.

Every simulation draws on real network topology, actual connection queue data, constraint physics, and market-derived price signals. The result is site-specific intelligence that reflects how the grid actually works.

LIFO queue modelling

Full queue reconstruction with project-level granularity. We know who's ahead of you and what they're building.

Attrition scenarios

What happens when projects ahead withdraw, delay, or downscale? We model the range of outcomes and their probability.

Price formation

Constraint-aware price models using our own data or your preferred wholesale curve. Includes constraint aware wholesale arbitrage modelling for BESS. Revenue impact, not just volume impact.

Constraint physics

Real network topology, thermal limits, and boundary flows. Not a flat percentage applied across the year.

Stage 1 deliverables

A screening intelligence pack, not a consultant's opinion.

Every deliverable is designed for one purpose: giving capital allocators the information they need to make informed decisions about grid-connected infrastructure. Formatted for IC papers, credit memos, and board packs.

Deeper analysis is available through bespoke engagements for sites that warrant it.

Curtailment quantification by hour-by-month heatmap
Queue position analysis and attrition sensitivity
Revenue impact and sensitivities under multiple scenarios
Connection feasibility assessment
Full assumption register for model transparency
Walkthrough call with the team
Try it yourself

See how curtailment affects project economics.

Use the slider to explore how different curtailment scenarios impact your project's net present value and revenue. This interactive tool illustrates the sensitivity of returns to queue position and attrition patterns.

35%
Adjusted NPV £4.6m
Revenue Delta -26%
DSCR Value 1.66x

Ready to screen a site?

A 20-minute call is enough to establish whether your sites need a closer look.

Talk to Henry